Cambridge Medical Centre upgrade
We successfully managed the construction of the Cambridge Medical Centre upgrade within a tight time frame, while day-to-day operations were still occurring – as most of the original building was modified at some point during the construction process.
Client | Cambridge medical centre |
Year completed | 2009 |
Location | Cambridge |
Architect | LAD Architecture |
Category | Health |
Service | Construction Management |
Project Description
The Cambridge Medical Centre project was the result of a successful tender through LAD Architecture, construction management delivered in a traditional manner. It had a strict time frame, so we had to do demolition work in January, and then be complete in September – October, all while they carried on with their existing business. The project required close coordination with Medical Centre staff continuing business as usual.