Cambridge Medical Centre upgrade

We successfully managed the construction of the Cambridge Medical Centre upgrade within a tight time frame, while day-to-day operations were still occurring – as most of the original building was modified at some point during the construction process.

ClientCambridge medical centre
Year completed2009
LocationCambridge
ArchitectLAD Architecture
CategoryHealth
ServiceConstruction Management

Project Description

The Cambridge Medical Centre project was the result of a successful tender through LAD Architecture, construction management delivered in a traditional manner. It had a strict time frame, so we had to do demolition work in January, and then be complete in September – October, all while they carried on with their existing business. The project required close coordination with Medical Centre staff continuing business as usual.